
Construction & EPC
Safety and progress on sites that change every week — with or without fixed CCTV.
- Large projects
- Industrial construction
- Infrastructure EPC
Moving sites, work at height, tight schedules.
- 01Falls from height
- 02No fixed cameras, power or network on site
- 03Plant–pedestrian interaction
- 04Progress reporting against schedule



Where Infraglance fits in construction & EPC.
Work at height
Harness tie-off and unprotected edges on scaffolds and structures.
View Guard HeightPortable monitoring
Solar + 4G Glance Pod units moved as the site evolves.
View Guard PPE+Swing radius
Crane and excavator exclusion zones.
View Guard ZoneProgress vs BIM
Weekly progress against the model and schedule.
View Infra ProgressHow it works, step by step.

PPE compliance
Worn-state PPE checks on your existing CCTV, with rules set per zone, shift and task, and one event per violation instead of an alert flood.
Read the use case
Work at height
Detects people working at height, checks hook-to-anchor attachment, and flags open edges and unsafe ladder use — on fixed CCTV or portable Glance Pods.
Read the use case
Bridge inspection
Drone and fixed-camera capture, detection of cracks, spalling and corrosion with width estimates, and change tracked across surveys, reviewed by engineers.
Read the use case
Let’s look at your next project.
Start with a paid feasibility study on your own footage or samples. In one to two weeks you’ll know what can be detected, how accurately, and what it’s worth.