
One camera watching what used to need ten sensors.
Flow monitors bulk-material conveyors for rips, drift, spillage, blockages and hot idlers, and production lines for jams, gaps, fallen products and the micro-stops nobody logs.
Bulk conveyor with material stream, thermal idler alert and drift tracking.
The gaps we built Flow to close.
Each conveyor failure mode needs its own point sensor.
One vision unit covering rip, drift, spillage, blockage and foreign objects together.
Micro-stops under two minutes are never logged.
Automatic stop detection feeding a true OEE picture by station and shift.
Video cannot tell if a conveyor should be running.
Fusion with PLC / SCADA signals: motor on + no movement = jam.
See where the minutes go.
Throughput, micro-stops and bottlenecks by station and shift — the losses that never make it into a manual OEE report.
Built with the people who own the outcome.
- Maintenance & reliability heads
- Operations managers
- Logistics managers
Glance Flow in practice.

Conveyor belt monitoring
Monitors bulk conveyors for belt damage, tracking drift, spillage, chute blockage, hot idlers and foreign objects, and turns findings into work orders.
Read the use case
Micro-stops & OEE
Detects jams, pile-ups, fallen products, gaps and stops under two minutes, fused with PLC state so lost time is pinned to the right station and cause.
Read the use caseRead more from our engineers.

Conveyor belt monitoring with vision: rips, drift, spillage and hot idlers
Bulk conveyors fail in a handful of predictable ways. Where cameras and thermal imaging beat point sensors, where they don’t, and why PLC signals matter.
Read article
Edge or cloud? Where industrial video analytics should actually run
Bandwidth, latency, privacy and offline operation decide where video AI belongs. A practical guide to edge, cloud and the hybrid most plants end up with.
Read article
Building a vision-AI business case EHS and finance will both sign
How to baseline, choose leading indicators, design a pilot and count total cost, with a clearly labelled worked example instead of borrowed ROI claims.
Read article
Let’s look at your conveyors and lines.
Start with a paid feasibility study on your own footage or samples. In one to two weeks you’ll know what can be detected, how accurately, and what it’s worth.